Skip to main content
Build with Ferguson is becoming Ferguson Home. Learn more

My Projects

Projects

Log In

Orders & Returns

Menu

Account

My Projects

Projects

Call

(800) 638-8875

0

Cart

Shipping to:Chico, CA
Watermark
Watermark Loft 2.0 7-1/2" Tub Spout Aged Brass (Living)
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Watermark Loft 2.0 7-1/2" Tub Spout Aged Brass (Living)
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image
Alternate Image

Watermark Loft 2.0 7-1/2" Tub Spout

Model: 23-WBS-APB
|
Item: bci4833976

$453.75
Finish: Aged Brass (Living) -
Special Order
Finish: Aged Brass (Living) -
Special Order
placeholder
Free Shipping!
Leaves the Warehouse in 3 to 7 weeks
-
Return & Shipping Details

Details

This wall mounted bath spout from Watermark's Loft 2.0 collection has an 8" overall length and a 1/2" NPT connection. The Loft 2.0 collection provides unique elements and a universal form that still maintains a quality of construction and finish that is the hallmark of all collections from Watermark. For more than four decades, Watermark has been a leading manufacturer of decorative plumbing fixtures, bathroom accessories, grab bars, shower drains, and elegant hardware for the luxury commercial and residential markets.

Watermark WM-23-WBS Features:

  • Covered under Watermark's limited lifetime warranty and 1 year commercial warranty
  • Constructed of brass for reliability
  • High quality finish – will resist rust and corrosion through everyday use
  • Coordinates with products from the Loft 2.0 line seamlessly
  • Non-diverting tub spout – for use with multi-function wall mounted diverters
  • Unrestricted flow rate allows for rapid filling of the tub
  • All hardware required for installation is included
  • Made in America

Watermark WM-23-WBS Specifications:

  • Height: 4-7/8" (from top to bottom)
  • Length: 8" (from front to back)
  • Width: 2-3/4" (from left to right)
  • Spout Reach: 7-1/2" (from wall to center of spout outlet)
  • Connection Size: 1/2"
  • Connection Type: NPT

Dimensions and Measurements

Height
4.875 in.
Length
8 in.
Product Weight
1 lbs.
Spout Reach
7.5 in.
Water Connection
1/2"
Width
2.75 in.

Dimensions and Measurements

Height
4.875 in.
Length
8 in.
Product Weight
1 lbs.
Spout Reach
7.5 in.
Water Connection
1/2"
Width
2.75 in.

Included Components

Diverter Included
No

Included Components

Diverter Included
No

Characteristics and Features

Material
Brass
Theme
Modern
Water Connection Type
NPT

Characteristics and Features

Material
Brass
Theme
Modern
Water Connection Type
NPT

Warranty and Product Information

Approved for Commercial Use
Yes
ASME Code
A112.18.1
Certifications
ASME
Collection
Loft 2.0
Commercial Warranty
1 Year
Country Of Origin
USA
Made in America
Yes
Manufacturer Warranty
Limited Lifetime

Warranty and Product Information

Approved for Commercial Use
Yes
ASME Code
A112.18.1
Certifications
ASME
Collection
Loft 2.0
Commercial Warranty
1 Year
Country Of Origin
USA
Made in America
Yes
Manufacturer Warranty
Limited Lifetime

Reviews

(0)

Product Q&A

Matching Products